#1302 assigned defect
test bonding on master.ipp
| Reported by: | jhoblitt | Owned by: | cindy |
|---|---|---|---|
| Priority: | normal | Milestone: | |
| Component: | hardware | Version: | |
| Severity: | normal | Keywords: | |
| Cc: |
Description
Configure ethernet bonding between master.ipp and the IPP switch in the machine shop. First roll this conf out to all ipp dev machines then the production cluster at MHPCC.
Note:
See TracTickets
for help on using tickets.

we are currently using only 50% of our possible ethernet bandwidth. the described work would allow us to use both ethernet ports on each box.