| | 1 | * reorganize cab0 |
| | 2 | * mv ipp020 & ipp021 -> cab 6 & 7 |
| | 3 | * mv cabinet rails back at least 6" to allow room for network cabling and/or zero 0 cable guides |
| | 4 | * mv all nodes to private network with a NAT pool |
| | 5 | * needed supplies |
| | 6 | * blackbox cable clamps |
| | 7 | * velcro tape |
| | 8 | * 1" white TZ tape |
| | 9 | * cable guides for the tops of cabinets 5, 6, & 7 (2 lost, 1 destroyed in shipping) |
| | 10 | * need 2' power cords and Y-power cords (supply out) |
| | 11 | * need to find the 1U rackmount monitor/keyboard + 30' vga cable or need to buy another unit |
| | 12 | * cab3pdu1 needs to be installed |
| | 13 | * depending on the size of wave4, more switch ports may need to be provisioned for |