- reorganize cab0
- mv ipp020 & ipp021 -> cab 6 & 7
- mv cabinet rails back at least 6" to allow room for network cabling and/or zero 0 cable guides
- mv all nodes to private network with a NAT pool
- needed supplies
- blackbox cable clamps
- velcro tape
1" white TZ tape
- cable guides for the tops of cabinets 5, 6, & 7 (2 lost, 1 destroyed in shipping)
- need 2' power cords and Y-power cords (supply out)
- need to find the 1U rackmount monitor/keyboard + 30' vga cable or need to buy another unit
- cab3pdu1 needs to be installed
- depending on the size of wave4, more switch ports may need to be provisioned for
- additional #2 screw drivers, it's amazing how easily these walk off.