Changes between Version 2 and Version 3 of staticsky.20120706


Ignore:
Timestamp:
Dec 4, 2012, 2:25:09 PM (14 years ago)
Author:
bills
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • staticsky.20120706

    v2 v3  
    1919
    2020As a result of further discussions it was determined to go back to processing by RA stripes. The RA band including the Kepler field was made the highest priority.
    21 The skycells with centers above declination 10 were completed on 2012-12-04. The plot below shows the completion at this time
     21The skycells with centers above declination 10 were completed on 2012-12-04. The plot below shows the completion at that time.
     22
    2223[[Image(ssky.20121204.png)]]
     24
     25== Sky Calibration ==
     26The staticsky calibration processing was begun on 2012-12-03. This proceeds at a higher rate then the psphot operations.
     27
     28For the region of proposed first ingest (270 < RA < 300) there are 55733 skycells to process. 14865 were completed on the first day.
     29
     30== Going Forward ==
     31The current plan is to postpone processing of the region near the galactic center (270 < RA < 300, DEC < 10) and proceed with ra stripes at 120 degrees.