Changes between Version 2 and Version 3 of staticsky.20120706
- Timestamp:
- Dec 4, 2012, 2:25:09 PM (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
staticsky.20120706
v2 v3 19 19 20 20 As a result of further discussions it was determined to go back to processing by RA stripes. The RA band including the Kepler field was made the highest priority. 21 The skycells with centers above declination 10 were completed on 2012-12-04. The plot below shows the completion at this time 21 The skycells with centers above declination 10 were completed on 2012-12-04. The plot below shows the completion at that time. 22 22 23 [[Image(ssky.20121204.png)]] 24 25 == Sky Calibration == 26 The staticsky calibration processing was begun on 2012-12-03. This proceeds at a higher rate then the psphot operations. 27 28 For the region of proposed first ingest (270 < RA < 300) there are 55733 skycells to process. 14865 were completed on the first day. 29 30 == Going Forward == 31 The current plan is to postpone processing of the region near the galactic center (270 < RA < 300, DEC < 10) and proceed with ra stripes at 120 degrees.
