Changes between Version 18 and Version 19 of staticsky.20120706


Ignore:
Timestamp:
Dec 12, 2012, 4:28:05 PM (14 years ago)
Author:
bills
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • staticsky.20120706

    v18 v19  
    88
    99[[Image(ssky.20121212.png)]]
    10 
    11 
    12 == Beginnings 2012-11-21 ==
    13 It was decided to begin the stack photometry with the region containing the Kepler field (18h30m,+33d45') -> (20h20m,+52d30'). These skycells were queued
    14 for staticsky processing on November 21.
    15 
    16 After those runs completed a list of projection cells that had completed LAP stacking were queued for processing. These were queued in order of projection cell
    17 number. This turns out to be a band at low declinations. These proceeded over the Thanksgiving holiday weekend.
    18 
    19 == Change of direction 1 ==
    20 After the holiday a change of direction was made. Rather than go in band of declination we went to stripes in RA. The outstanding runs were set to
    21 state ='wait' and skycells were queued in the band 9 < RA < 10
    22 
    23 == Change of direction 2 ==
    24 Due to some mis-communication we decided that it would be better for PSPS to load in decliation bands, so the existing runs were set back to state ='new' and
    25 new runs were queued in this region.
    26 
    27 == Change of direction 3 ==
    28 
    29 As a result of further discussions it was determined to go back to processing by RA stripes. The RA band including the Kepler field was made the highest priority.
    30 The skycells with centers above declination 10 were completed on 2012-12-04. The plot below shows the completion at that time.
    31 
    32 [[Image(ssky.20121204.png)]]
    33 
    34 == Sky Calibration ==
    35 The staticsky calibration processing was begun on 2012-12-03. This proceeds at a higher rate then the psphot operations.
    36 
    37 For the region of proposed first ingest (270 < RA < 300) there are 55733 skycells to process. 14865 were completed on the first day.
    38 
    39 == Going Forward ==
    40 The current plan is to postpone processing of the region near the galactic center (270 < RA < 300, DEC < 10) and proceed with ra stripes at 120 degrees. So far I have left the existing runs in wait state, and change them to run as needed. For simplicity we could drop them and change the label, but so far I've been managing the states. Here are the locations of the "waiting" skycells.
    41 
    42 [[Image(lapssky.waiting.20121204.png)]]
    43 
    44 == Change in direction 4 ==
    45 It was decided that rather than starting at ra 120 degrees, to instead process southern most part of the sky between 0 and 15 hours and
    46 declination < 10 degrees. The goal is to provide potential quasar targets for a KP10 group at MPIA that has observing time at La Silla net month.
    4710
    4811== Sky calibration status ==
     
    8447This effect is seen in 3% of the skycells north of 30 degrees declination.
    8548[[Image(mdr_cut.jpg)]]
     49
     50== Beginnings 2012-11-21 ==
     51It was decided to begin the stack photometry with the region containing the Kepler field (18h30m,+33d45') -> (20h20m,+52d30'). These skycells were queued
     52for staticsky processing on November 21.
     53
     54After those runs completed a list of projection cells that had completed LAP stacking were queued for processing. These were queued in order of projection cell
     55number. This turns out to be a band at low declinations. These proceeded over the Thanksgiving holiday weekend.
     56
     57== Change of direction 1 ==
     58After the holiday a change of direction was made. Rather than go in band of declination we went to stripes in RA. The outstanding runs were set to
     59state ='wait' and skycells were queued in the band 9 < RA < 10
     60
     61== Change of direction 2 ==
     62Due to some mis-communication we decided that it would be better for PSPS to load in decliation bands, so the existing runs were set back to state ='new' and
     63new runs were queued in this region.
     64
     65== Change of direction 3 ==
     66
     67As a result of further discussions it was determined to go back to processing by RA stripes. The RA band including the Kepler field was made the highest priority.
     68The skycells with centers above declination 10 were completed on 2012-12-04. The plot below shows the completion at that time.
     69
     70[[Image(ssky.20121204.png)]]
     71
     72== Sky Calibration ==
     73The staticsky calibration processing was begun on 2012-12-03. This proceeds at a higher rate then the psphot operations.
     74
     75For the region of proposed first ingest (270 < RA < 300) there are 55733 skycells to process. 14865 were completed on the first day.
     76
     77== Going Forward ==
     78The current plan is to postpone processing of the region near the galactic center (270 < RA < 300, DEC < 10) and proceed with ra stripes at 120 degrees. So far I have left the existing runs in wait state, and change them to run as needed. For simplicity we could drop them and change the label, but so far I've been managing the states. Here are the locations of the "waiting" skycells.
     79
     80[[Image(lapssky.waiting.20121204.png)]]
     81
     82== Change in direction 4 ==
     83It was decided that rather than starting at ra 120 degrees, to instead process southern most part of the sky between 0 and 15 hours and
     84declination < 10 degrees. The goal is to provide potential quasar targets for a KP10 group at MPIA that has observing time at La Silla net month.
     85