| Version 1 (modified by , 14 years ago) ( diff ) |
|---|
Out line
- Confirm changed IPP to PSPS mappings with Ken
- Make and test alter script
- Change psps_schema (consider a branch). confirm with main, views, etc. Also change csv files.
- Change ODM (i.e stored procedures)
- Check PSPSSchemaParser.
- Extend changes to tables and stored procedures in existing databases (3PI, MDF).
- try new schema with new SAS
- test load/merge
- other verifications
Note:
See TracWiki
for help on using the wiki.
