IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Changes between Version 68 and Version 69 of Production_Work_Log


Ignore:
Timestamp:
Apr 10, 2013, 2:44:22 PM (13 years ago)
Author:
rmattson
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Production_Work_Log

    v68 v69  
    1414   - Haydn removed the DELL 1U server on 4/8 that will be returned.
    1515   - Rita mounted the new Cisco 2960S-48TB-L in Cab 0 and inserted teh two SFP10G-SR transceiver modules.
    16    - While there at MHPCC the IPPCORE was having problems that affected ports 9 - 13, kept rebooting and losing power.  Gavin and Brad were troubleshooting this most of the day.  Gavin contacted Cisco and new software was installed, which seems to have stabilized the router.  Will see if this fixes the problem before continuing with the rest of the 10GB data transfer hardware swap.
     16   - While there at MHPCC the IPPCORE was having problems. See
     17   http://svn.pan-starrs.ifa.hawaii.edu/trac/ipp/wiki/ippcore_log for details.  Will  continue with the 10GB data hardware swap once the IPPCORE  is stable.
    1718
    1819== Apr 8 (Haydn) ==