    33= 2013 Production Node Work =
     4
     5== Apr 10 (Rita) ==
     6
     7 - Worked on ippdb00 and swapped out the 300GB disks for new 600GB disks.  Reconfigured the RAID array, and handed over the OS rebuild to Gavin and Haydn to perform remotely.  All came up fine and IPP team was notified that afternoon that they could proceed.
     8 - While there, Gene and team updated stsci06 with ver 3.6.7 of kernel remotely and reboot.  From what I could see manually all seemed fine when system came back online.
     9
     10== Apr 9 (Rita) ==
     11
     12 - Worked on the 10GB data transfer hardware swap
     13   - Indiana Univ. hardware that has been on loan needs to be swamped with new hardware PS1 has recently purchased, so loaned hardware can be returned.
     14   - Haydn removed the DELL 1U server on 4/8 that will be returned.
     15   - Rita mounted the new Cisco 2960S-48TB-L in Cab 0 and inserted teh two SFP10G-SR transceiver modules.
     16   - While there at MHPCC the IPPCORE was having problems that affected ports 9 - 13, kept rebooting and losing power.  Gavin and Brad were troubleshooting this most of the day.  Gavin contacted Cisco and new software was installed, which seems to have stabilized the router.  Will see if this fixes the problem before continuing with the rest of the 10GB data transfer hardware swap.
    417
    518== Apr 8 (Haydn) ==