IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Changes between Version 138 and Version 139 of Production_Work_Log


Ignore:
Timestamp:
Nov 13, 2014, 1:39:13 PM (12 years ago)
Author:
huntley
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Production_Work_Log

    v138 v139  
    22
    33= 2014 Production Node Work =
     4
     5== November 13 (Haydn, Rita, Donna) ==
     6 - Haydn & Donna racked 14 2U compute nodes, and 7 4U storage nodes.
     7 - Rita - labeling.
     8 - Tried to fix stsci03.  No luck.
     9 - Donna - installing drives.
     10
     11== November 12 (Haydn, Rita) ==
     12 - ippx001, and ippx003-ippx007 - are all now up.
     13 - cooling outage at 5pm.  Brought everything down, except for ippc18 and ippc19.
     14 - stsci03 wouldn't come back on, though the power supplies are fine.
     15 - ipp052 wouldn't boot.  It stops after printing "Initializing BMC".
     16
     17== November 10 (Haydn)
     18 - ippx002 is now up.
     19
     20== November 7 (Haydn)
     21 - Trying to get ippx001 and ippx002 up.
     22
     23== November 6 (Haydn)
     24 - Trying to get ippx001 and ippx002 up.
     25
     26== November 5 (Haydn)
     27 - Installing ACS48 and Cisco 4948-10GE for cab23 and running cables for them.
    428
    529== November 4 (Rita) ==