    22
    33= 2014 Production Node Work =
     4
     5== September 19 (Haydn & Rita) ==
     6 - Rita finished installing the 4TB drives in the last two machines.
     7 - Rita removed all of the 1TB 2.5" Jaws drives from their carriers.
     8 - ipp013 - Haydn found a short in the 12v fan power cord, where Tyler had accidentally stretched it tight across the sharp edge of a CPU heatsink.  Also had to clear and reconfigure the CMOS BIOS settings.
     9
     10== September 18 (Haydn & Rita) ==
     11 - Rita finished installing the 4TB drives in all but two machines.
     12 - Rita took inventory.
     13 - Gavin got ipp081 working.
     14 - Haydn got ipp079 and ipp076 done.
    415
    516== September 17 (Haydn & Rita) ==