IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Changes between Version 53 and Version 54 of Production_Cluster_Status


Ignore:
Timestamp:
Aug 22, 2012, 1:34:52 PM (14 years ago)
Author:
gavin
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Production_Cluster_Status

    v53 v54  
    77[wiki:Production_Spares_List List of Spares for Production Nodes]
    88
    9 == MRTC-A Building Power Outage Scheduled for August (26th) 12pm - 1pm HST ==
    10  * MRTC-A will be installing electrical meters
     9== Network Outage due to MRTC-A Building Power Outage Scheduled for August (26th) 12pm - 1pm HST ==
     10 * MRTC-A will be installing electrical meters.
    1111 * UH ITS Routers located in MRTC-A will be down, this is the only route out to the internet for PS1 IPP & PSPS, network will be unavailable during the scheduled power outage.
    1212