Changes between Version 23 and Version 24 of PS1_IPP_Czarlog_20150727
- Timestamp:
- Jul 31, 2015, 10:11:54 AM (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
PS1_IPP_Czarlog_20150727
v23 v24 71 71 * 08:40 MEH: summitcopy mostly done with last 3PI images and just darks, adding gpc2 db back in to continue downloading those now 72 72 * 08:55 MEH: camera stage is the bottleneck has been doing better -- adding WS label in for a bit so not run out of things to do rather than adding more camera jobs with gpc2 until gpc1 cleared 73 * 10:00 MEH: top priority OSS gpc1 is finished, once 3PI camera clears then add back gpc2 to stdsci. ~100 gpc2 exposures left to download 74 * second priority gpc1 SNIa finished and WSdiff probably take >3 hrs still -- 75 * gpc2 data also likely >3hrs 73 76 === Saturday : YYYY.MM.DD === 74 77
