Changes between Version 5 and Version 6 of PS1_IPP_Czarlog_20141201
- Timestamp:
- Dec 1, 2014, 7:50:19 PM (12 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
PS1_IPP_Czarlog_20141201
v5 v6 17 17 18 18 === Saturday : 2014.12.06 === 19 * planned downtime MRTC-B 590B Lipoa Automatic Transfer Switch (ATS) -- Saturday December 6th. We will be starting our shutdown processes at 8am and will hopefully start turning things back on at 3pm. 19 * planned downtime MRTC-B 590B Lipoa Automatic Transfer Switch (ATS) -- Saturday December 6th. They will be starting our shutdown processes at 9am and will hopefully start turning things back on at 3pm. 20 * all processing stopped before ~8am 21 * Haydn on site to start power down of systems @8am 20 22 === Sunday : 2014.12.07 ===
