| 35 | | * planned downtime MRTC-B 590B Lipoa Automatic Transfer Switch (ATS) -- Saturday December 6th. They will be starting our shutdown processes at 9am and will hopefully start turning things back on at 3pm. |
| 36 | | * all processing stopped before ~8am |
| 37 | | * Haydn on site to start power down of systems @8am |
| | 35 | * '''revised''' -- planned downtime MRTC-B 590B Lipoa Automatic Transfer Switch (ATS) -- Saturday December 6th. They will be starting our shutdown processes at 9am and will hopefully start turning things back on at 3pm. |
| | 36 | * '''all processing stopped before ~7am''' |
| | 37 | * Haydn on site to start power down of systems @7am |