IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Changes between Version 20 and Version 21 of PS1_IPP_Czarlog_20130805


Ignore:
Timestamp:
Aug 8, 2013, 11:48:50 AM (13 years ago)
Author:
watersc1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PS1_IPP_Czarlog_20130805

    v20 v21  
    2828 * warp and chip stage postage stamps for calibrated 3PI.PV1 exposures will now have information about the photometric calibration added to the fits headers.
    2929 * 10:40 MEH: chip.on again stdsci, everything is backlogged in warp so won't be any new chips but the few remaining
     30 * 11:40 CZW: set "controller parameters unwant = 20" in stdscience, to see if that clears the warp bottleneck.  This seems to have launched enough jobs to fill all processing cores in stdscience, without changing the load on the stsci nodes significantly.
    3031=== Friday : 2013.08.09 ===
    3132