IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Changes between Version 64 and Version 65 of PS1_IPP_Czarlog_20130729


Ignore:
Timestamp:
Aug 2, 2013, 10:50:06 AM (13 years ago)
Author:
bills
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • PS1_IPP_Czarlog_20130729

    v64 v65  
    105105 * 10:11 M31 warp and warp_bg jobs are taking 5 x as long to run when the path base is on stsci04. Last night's nightly science does not show this effect. Neither did the warp_bg runs for the 201008 exposures. Gavin had a look and there doesn't seem to be anything wrong with the hardware. Assuming that this is a side effect of being so far behind I'm setting stsci04 to repair. This will distribute the writes to other nodes and may help with the backlog. Turning warp_bg back on lowering poll to 100.
    106106 * 10:25 chip.off
     107 * 10:48 changed priority of M31.rp.2013.bgsub label to 200 to match LAP. This will give the LAP warp updates priority over the M31 warps which should reduce the total I/O demands. The warp_bg runs will continue to run however so M31 will make some progress.
    107108=== Saturday : 2013.08.03 ===
    108109