    5 June 29 -  We have finished Grand Reprocessing of the g band in the 14hr to 16 hr stripe. This data is believed to be compromised by the dark current model used for the older data.
     5June 29 -  We have finished Grand Reprocessing of the g band in the 14hr to 16 hr slice. This data is believed to be slightly compromised by the dark current model used for the older data.
    66
    7 June 29 - start GR of  14hr to 16 hr stripe  in y band, followed by z band ~ 10 days of processing.
     7June 29 - start GR of  14hr to 16 hr stripe  in y band, followed by z band ~ 10 days of processing. For y and z band the noise is completely dominated by the noise in the sky background, and the dark current model does not affect the results.
    88
    99July 10  - start MD04 reprocessing
     
    1111before July 15 - start MD10 reprocessing, and creation of template. Then the incoming new MD10 data in OC142 will use this template and will be done on the new tesselation. The MD 07, 08, 09 will continue with old pixel size and tessellation so as not to interrupt transient program.
    1212
    13 on or before July 15 - continue with GR with new dark model in i, r, and g.
     13on or before July 15 - continue with GR with correct dark model in i, r, and g.
    1414
    1515Schedule MD07 next as we learn how long reprocessing an MD field takes. Then in parallel with 3pi GR, proceed with MD05 and 06. We would like to be ready to reprocess MD 08 and 09 by the time each has finished for the year.
     
    1717=== PSPS ingest ===
    1818
    19 June 30 - we will start ingesting of all the currently completed GR (LAP) DVO database now. When we have finished loading g and y band, by approximately July 12, we will delete all the old data currently in the PSPS, and do the first merge/indexing of the completed GR data. Note the g,r,i,z,y initial LAP data will be there as well.  This will take about two days during which PSPS will be offline. Then PSPS will be online and available for consortium use on July 15.
     19June 30 - we will start ingesting of all the currently completed GR (LAP) DVO database NOW. When we have finished loading  the g and y band, by approximately July 12, we will delete all the old data currently in the PSPS, and do the first merge/indexing of the completed GR data. Note the g,r,i,z,y from the initial LAP test data overlapping Stripe 82 will be there as well, but the g,r, and i data have higher noise from the dark current.  This will take about two days during which PSPS will be offline.
     20
     21July 15 - PSPS will be online and available for consortium use on July 15. From then on until next stage in photometry discussed below, we will be in ~normal ingest rate as the GR proceeds so by the end of July there should be all five bands from the 14 to 16 hour RA slice.
    2022
    2123=== Caveats ===
    2224
    23 People should be aware that the ingested data has the same photometry issues as in the current processing. Thus it is not Data Release 1.0. It is data release 0.1. For details on the outstanding photometric issues see the PS1SC wiki DRAVG pages.
     25People should be aware that the ingested data has the same photometry issues as in the current IPP processing. Thus it is _not_ Data Release 1.0. It is data release 0.1. For details on the outstanding photometric issues see the PS1SC wiki DRAVG pages.
    2426
    2527The g, r, and i band data in this release will have higher noise than they should. (The only 5 band data will be the initial LAP release that overlaps some of Stripe 82). It is believed this is a problem with the current dark current model being used for the old data we are re-processing. We will not save this pixel data, we will reproduce it with the correct dark model on the above schedule.