MD.PV3
v65 v66 50 50 51 51 == Plan to Complete PV3 == 52 draft update Jan. 4, 2018 -- 52 draft update Jan. 4, 2018 -- time estimates are based on 100% effort, typical effort is only ~10-20% due to system and ops demands 53 53 * delayed start until 1/22, everything needs to be shifted +3 weeks 54 * mostly delayed until 3/1, everything needs to be shifted +weeks 54 55 55 56 camera SMF -- 56 * ~0.5wk to finish verification, ready ~ mid-January57 * ~0.5wk to finish verification, ready ~~~mid-January 57 58 * can be loaded into DVO once final DR2 code/formats ready and doesn't conflict with DR2 work 58 59