| 5 | | Summary page of information for the MD GR0 (grand reprocessing version 0) including the new reference stack in the V3 tessellation with the start of new observations of MD10 in OC142. This is version 0 as the test start of full reprocessing of the MD fields to be balanced along with other reprocessing, 3PI stacks and nightly science, generation of new reference stacks and as of yet does not include a revised reference calibration catalog (currently for MD10, 01, 02). |
| 6 | | |
| 7 | | Creation of the new reference stacks need to be at the very least made prior to the return to the particular MD field given in the current schedule |
| 8 | | http://ps1sc.ifa.hawaii.edu/PS1wiki/index.php/Medium_Deep_Schedule. After the July, August, September time crunch of a new field a month there should be time to continue reprocessing and creation of new reference stacks in advance. |
| | 5 | Summary page of information for the MD GR0 (grand reprocessing version 0) including the new reference stack in the V3 tessellation with the start of new observations of MD10 in OC142. This is version 0 as the test start of full reprocessing of the MD fields to be balanced along with other reprocessing, 3PI stacks and nightly science, generation of new reference stacks and as of yet does not include a revised reference calibration catalog (currently for MD10, 01, 02, 03, 04). |
| | 6 | |
| | 7 | Creation of the new reference stacks need to be, at the very least, made prior to the return to the particular MD field given in the current schedule |
| | 8 | http://ps1sc.ifa.hawaii.edu/PS1wiki/index.php/Medium_Deep_Schedule. After the July, August, September time crunch of a new field a month, there should be time to continue reprocessing and creation of new reference stacks in advance. |