Changes between Version 18 and Version 19 of IPP_Progress_Report_20120423
- Timestamp:
- Apr 30, 2012, 12:06:07 PM (14 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
IPP_Progress_Report_20120423
v18 v19 25 25 * MD08.GR (grand reprocessing) -- http://svn.pan-starrs.ifa.hawaii.edu/trac/ipp/wiki/MD.GR0#MD08.GR0 26 26 * continuing from mostly setup last week to finishing this week 27 * ~8 days overall with nights+weekend (processing + setup/inspection/verification/documentation time). 1 filter (~500 exposures) can finish in 4-6 hours, and can also process along normal nightly science with the new nodes at about half that rate.27 * ~8 days overall with nights+weekend (processing + setup/inspection/verification/documentation time). 1 filter (~500 exposures) can finish chip->warp processing in 4-6 hours, and can also process along normal nightly science with the new nodes at about half that rate. 28 28 * tested Serge's reconfig of condor the previous week, but with ganglia down, ended up not using condor this round (no LAP currently to contend with), manually monitoring would end up cutting in to too much other work. 29 29 * adding extra cuts to help constrain target PSF in convolved stacks (relates to PSF evaluation in ppStack work).
