    2323=== Mark Huber ===
    2424 * Czar Monday and Tuesday (kicking Roy off the schedule), usual issues: unsticking registration during night, stdscience stalling, tracking down odd/slow processing exposures, distribution flushing from destreak_restore pileup to get out time sensitive products.
    25  * MD08 refstack creation, grand reprocessing release, staticsky run. details in the usual place http://svn.pan-starrs.ifa.hawaii.edu/trac/ipp/wiki/MD.GR0#MD08.GR0
    26  * setting up, running another test sample for ppSub testing. details in the usual place https://svn.pan-starrs.ifa.hawaii.edu/trac/ipp/wiki/ppSub_testing_201201
     25 * MD08.GR (grand reprocessing) -- http://svn.pan-starrs.ifa.hawaii.edu/trac/ipp/wiki/MD.GR0#MD08.GR0
     26  * continuing from mostly setup last week to finishing this week
     27  * ~8 days overall with nights+weekend (processing + setup/inspection/verification/documentation time). 1 filter (~500 exposures) can finish in 4-6 hours, and can also process along normal nightly science with the new nodes at about half that rate.
     28   * tested Serge's reconfig of condor the previous week, but with ganglia down, ended up not using condor this round (no LAP currently to contend with), manually monitoring would end up cutting in to too much other work.
     29   * adding extra cuts to help constrain target PSF in convolved stacks (relates to PSF evaluation in ppStack work).
     30   * lost of images (Serge investigated and has tool now, but they are gone) and always fun manual burntool to fix.
     31   * collating night stack reprocessing faults with PSF problems (also ties to PSF evaluation in ppStack work).
     32  * additional reftest to included all exposures and just from previous year (2011).
     33  * added staticsky run with improved convolved stacks.
     34  * looked at worse case of a "school of ghosts" in g-band.
     35  * updating processing node access on Harvard/odyssey system (delayed from recent shakedown until needed).
     36  * MD08-z observed early on weekend, restarted normal MD08 processing with new refstack.
     37 * ppStack -- http://svn.pan-starrs.ifa.hawaii.edu/trac/ipp/wiki/ppStack_testing_201111
     38  * still working through 7TB of tests to clean up while winding down setup to switch again to ppSub.
     39 * ppSub tests -- http://svn.pan-starrs.ifa.hawaii.edu/trac/ipp/wiki/ppSub_testing_201201
     40  * finished the tedious process of setting up additional template and test images for local photpipe with an additional filter based on some other QUB examples with problems while waiting for QUB to prepare their IPP vs photpipe comparison (out on travel still).
     41  * normal hangups tracing problems in two pipelines, sample of convolved reference/template image (default), auto convolution choice with photpipe and convolved input image with IPP.
    2742=== Bill Sweeney ===
    2843