    v12 v13  
    55
    66=== Eugene Magnier ===
     7
     8 * added a feature to setphot to pass a set of overall zero point offsets for each filter.  This is needed to assign the ubercal solution and then offset the system to the JT recommendation
     9 * mextract -parallel basically works : needed to add a pass-through to dvo_client for some environment values (TIMEREF, TIMEFORMAT, CAMERA, etc)
     10 * spent some of the week tracking down bugs in the relphot and mextract processes. 
     11 * started to look more carefully at a test subset of the 3pi dvo db to verify the results of relphot
     12 * some modifications to dvodist to improve the speed & reliability; started the big dvodist job to spread the full 5TB 3pi dvo db across ~60 machines on the cluster.
     13 * more work over the weekend to worry about clipping and outlier rejection in the relphot analysis
    714
    815=== Serge Chastel ===