| | 15 | * Reorganized warptool -towarped to avoid very long query time when lots of warp runs are outstanding. The problem was with the way 'order by priority' was implemented. |
| | 16 | * Implemented changes to publishing system to allow OSS and 3pi detections to be processed simultaneously. |
| | 17 | * Created chip runs for the CNP calibration fields. Rediscovered bug in getting stars reference catalogs near the pole. |
| | 18 | * Created new MD04 tessellation MD04.V3 which has pixel size closer to the gpc1 camera. Queued new set of warps for those. |
| | 19 | * Studied chip processing in preparation for implementing replicated outputs and better handling of update errors. |
| | 20 | * Wrangled some exposures through the system to the rsync server for the outreach program. |
| | 21 | * Debugged and repaired more problems with MPIA postage stamp data store. Looks like I my have inadvertently deleted some data files. Now that I understand how the system is configured it will be easier to debug problems in the future. |
| | 22 | * Debugged and fixed problem on postage stamp request form. |
| | 23 | * One day as official processing czar. Other days was a pest for the acting processing czar. (Fix the faults.) |