IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Changes between Version 1 and Version 2 of IPP_Progress_Report_20101108


Ignore:
Timestamp:
Nov 12, 2010, 12:10:55 PM (16 years ago)
Author:
bills
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • IPP_Progress_Report_20101108

    v1 v2  
    1313
    1414=== Bill Sweeney ===
     15 * Reorganized warptool -towarped to avoid very long query time when lots of warp runs are outstanding. The problem was with the way 'order by priority' was implemented.
     16 * Implemented changes to publishing system to allow OSS and 3pi detections to be processed simultaneously.
     17 * Created chip runs for the CNP calibration fields. Rediscovered bug in getting stars reference catalogs near the pole.
     18 * Created new MD04 tessellation MD04.V3 which has pixel size closer to the gpc1 camera. Queued new set of warps for those.
     19 * Studied chip processing in preparation for implementing replicated outputs and better handling of update errors.
     20 * Wrangled some exposures through the system to the rsync server for the outreach program.
     21 * Debugged and repaired more problems with MPIA postage stamp data store. Looks like I my have inadvertently deleted some data files. Now that I understand how the system is configured it will be easier to debug problems in the future.
     22 * Debugged and fixed problem on postage stamp request form.
     23 * One day as official processing czar. Other days was a pest for the acting processing czar. (Fix the faults.)
    1524
    1625=== Chris Waters ===