IPP Software Navigation Tools IPP Links Communication Pan-STARRS Links

Changes between Version 3 and Version 4 of IPP_Progress_Report_20100412


Ignore:
Timestamp:
Apr 19, 2010, 9:02:20 AM (16 years ago)
Author:
heather
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • IPP_Progress_Report_20100412

    v3 v4  
    77
    88=== Heather Flewelling ===
     9 
     10 * processing czar 04-12-2010
     11 * Taught Roy about processing tasks as they came up.
     12 * sorted out ISP summitcopy - datastore issues. Erik Small made ISP datastore
     13   behave more like gpc1, Bill figured out how to get around problems like this
     14   in the future.
     15 * ISP registration - ISP images now register to camera stage, with camera
     16   label (only the OBJECT ones, ones which could potentially be processable),
     17   ISP registration merged in with gpc1
     18 * created ISP wiki of everything I could think of about ISP processing:
     19   * http://svn.pan-starrs.ifa.hawaii.edu/trac/ipp/wiki/ISP_Information
     20 * stack test of different plate scale (0.0258): label is
     21   MD04.20100415.scaletest.0258 , consists of 8 MD04 z band images from
     22   20100412. These are stuck due to failed warps (I need to sort this out). TESS_ID is MD04.V1
     23 * answered UIP's questions about processing ISP data - this is still in progress
     24 * added tess directories to ifaps1 (to make it more useable)
     25 * answered ifaps1 user questions throughout the week
     26 * Helped prepare for IFA Open House
     27 * manned PanSTARRS booth at IFA Open House
     28 * Helped Mike Lum (VYSOS data reduction) - this is still in progress
    929
    1030=== Bill Giebink ===