General Near-Term Goals
- address warp failures
- address camera failure
- address remaining stack concerns
- demo of diffs with dual conv -- ThreePi Southern Region again
Eugene Magnier
- flat-field correction
- run more flattests
- zero points -- use 'blue edge' and full camera
- psphot & difference images
- extended sources
- set upper limits on Petrosian radii
- make sure new structures are linked into output functions
- generate a more complete test set & run tests
- minor ippMonitor & DVO issues
- more data organization work on Manoa & MHPCC clusters
Heather Flewelling
- re-process run of MD08
- inject last of md5sums into db
- re-run small number of failures
- more magic evaluation
- megacam -> nebulous
- simtest work (consistency, etc)
- sdss photometry comparison (start with flat-field correction tests)
Bill Giebink
- DIMM work
- psLib & psModules test code
Paul Price
- stack non-convolutions (add mask & variance)
- diff dual convolution
Bill Sweeney
- finish re-jiggering the labeling scheme (add data_label, dist_label, proc_label = label)
- pstamp
- select different data products
- cleaned runs (need to fix labeling for update issues)
- add stuff to web server
- destreak
- warpwarp diffs has a bug
- distribution
- add label ability to client
- cleanup
- distribution of the work
- check on nebulous as a backend?
- vacation from friday 10.12
Chris Waters
- y-fringes : plug leaks & double check residuals
- flat verifies - finish other filters, examine structure
- nebulous
- unavailable instances errors still outstanding
- replicate bug
- random machine replication
Natalia Primak
- simtest input / output consistency checks
- simtest visualizations
Cindy Giebink & Steph Mohr
- upgrade hardware on ippc18 & ippc19 for home dirs