| | 1 | == Heather's Tasks == |
| | 2 | |
| | 3 | Here is heather's list of tasks to work on. |
| | 4 | |
| | 5 | == The most urgent == |
| | 6 | |
| | 7 | * u band stacks from MegaCam |
| | 8 | * multiple requests from KP5, JT, and ZZ. |
| | 9 | * remaining issues |
| | 10 | * we have clean/good processed single exposures from CADC |
| | 11 | * astrometry is funny for some of it due to lack of stars |
| | 12 | * possible ideas to fix: |
| | 13 | * force to be linear fits in astrometry |
| | 14 | * force to fit the exposure rather than the individual chips |
| | 15 | * chop out the crappy astrometry ones and stack |
| | 16 | |
| | 17 | * isp/skyprobe |
| | 18 | * Roger/Niall want skyprobe |
| | 19 | * astrometry/zeropoint problems |
| | 20 | * does isp still not ingest properly RA/DEC/etc from fits file? |
| | 21 | |
| | 22 | * psps |
| | 23 | * further iterations of SASdvo -> ipptopsps -> psps |
| | 24 | * will likely require changes to building dvos and ipptopsps |
| | 25 | |
| | 26 | == Lower priority Heather tasks == |
| | 27 | |
| | 28 | * ssp |
| | 29 | * periodically download ssp from atrc (BAAAAD) |
| | 30 | * work with jt to get monsta script and to process ssp (I have the scripts, need to automate them,etc) |
| | 31 | * switch to datastore for grabbing files when ssp/uip computer gets sorted out |
| | 32 | * when switched to datastore add ssp to summitcopy/registration |
| | 33 | |
| | 34 | * uip - set that up as well (summitcopy/registration) - the uip machine is not ready yet |
| | 35 | |
| | 36 | * gpc1 dvodbs |
| | 37 | * continue building ThreePi?/LAP, backing up as necessary |
| | 38 | |
| | 39 | * jtmd |
| | 40 | * queue jtmd stuff as requested |